Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 6, 2020, 10:33 AM
  • 32 1044_32 1043 _02062020_032216.mp4

Date
02/06/2020
W/O
808159
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P21531
Time
2:33 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7401
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_808159_TV32025_JAN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
32 1043
Downstream MH
32 1044
Dir. of Survey
Upstream
Length Surveyed
206.1 ft.
Total Length
206.1 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
200
O&M Index
2
O&M Quick
2G00
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
282
Pipe schematic from manhole 32 1043 to 32 1044
MH: 32 1043MH: 32 1044upstream0 ft. AMH - Upstream Manhole, Survey Ends - 32 10442.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish81.6 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6" - OPEN87.1 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"204.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start204.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start206.1 ft. MWL - Water Level, 10 %of cross sectional area206.1 ft. AMH - Downstream Manhole, Survey Begins - 32 1043206.1 ft. MWM - Water Mark, 15 %of cross sectional area206.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
119TBA
203.3CM
124.5TBOPEN
204SSS
206.1AMH32 1044
203.3DAGS
0MWL
2CM
2SSS
0AMH32 1043
0MWM
0DAGS

Properties (6)

additional_info
SC398790
custom_field_two
3
customer
LACSD
datetime
2020-02-06T02:33:48-08:00
documentation
PRO PIPE
is_lateral_inspection
false