Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2020, 10:33 AM
  • 32 1035_32 1034 _02112020_024659.mp4

Date
02/11/2020
W/O
808159
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19483
Time
2:33 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7404
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_808159_TV32025_JAN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1035
Downstream MH
32 1034
Dir. of Survey
Downstream
Length Surveyed
366.6 ft.
Total Length
366.6 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
357
O&M Index
2
O&M Quick
2M00
O&M Rating
144
Overall Index
2
Overall Quick
Overall Rating
501
Pipe schematic from manhole 32 1035 to 32 1034
MH: 32 1035MH: 32 1034downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 10350 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start10.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start287.7 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES - MINERALS362 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish364 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish366.6 ft. AMH - Downstream Manhole, Survey Ends - 32 1034

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: YES - MINERALS

    287.7 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES - MINERALS

Observations (11)

DistanceCodeObservation
10.2CM
366.6AMH32 1034
7DAGS
287.7DAZMINERALS
362SSS
0AMH32 1035
0MWL
364DAGS
0MWM
2SSS
364CM

Properties (6)

additional_info
SC398793
custom_field_two
3
customer
LACSD
datetime
2020-02-11T02:33:46-08:00
documentation
PRO PIPE
is_lateral_inspection
false