Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 21, 2020, 08:56 AM
  • A 0609_A 0608 _01212020_010146.mp4

Date
01/21/2020
W/O
803106
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00316
PipeID
P07814
Time
12:56 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7244
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
38
Purpose
Routine Assessment
Project
WO_803106_TV21027_DEC2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Width
51 in.
Upstream MH
A 0609
Downstream MH
A 0608
Dir. of Survey
Downstream
Length Surveyed
189.3 ft.
Total Length
189.3 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
183
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
183
Pipe schematic from manhole A 0609 to A 0608
MH: A 0609MH: A 0608downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 06090 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2.4 ft. MGO - General Observation - MAG COAT2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start59.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish59.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start185 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish189.3 ft. AMH - Downstream Manhole, Survey Ends - A 0608189.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    59.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0AMHA 0609
189.3AMHA 0608
59.8SAV
2.4MGOMAG COAT
59.8SAP
185SSS
189.3SAP
2.4SAV
3SSS
0MWL
0MWM

Properties (6)

additional_info
SC398539
custom_field_two
3
customer
LACSD
datetime
2020-01-21T00:56:20-08:00
documentation
PRO PIPE
is_lateral_inspection
false