Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2020, 10:53 AM
  • A 0628_A 0627 _01072020_030202.mp4

Date
01/07/2020
W/O
803106
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00316
PipeID
P07833
Time
2:53 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7233
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
33
Purpose
Routine Assessment
Project
WO_803106_TV21027_DEC2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
A 0628
Downstream MH
A 0627
Dir. of Survey
Downstream
Length Surveyed
220 ft.
Total Length
220 ft.
Structural Index
4
Structural Quick
5132
Structural Rating
11
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
11
Pipe schematic from manhole A 0628 to A 0627
MH: A 0628MH: A 0627downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 06280 ft. MWM - Water Mark, 25 %of cross sectional area4.8 ft. MGO - General Observation - MAG COAT4.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start204.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start204.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish210.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start220 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish220 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish220 ft. AMH - Downstream Manhole, Survey Ends - A 0627

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    204.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    210.6 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
220SAP
220SRV
0MWL
4.8MGOMAG COAT
204.4SAP
210.6SRV
220AMHA 0627
0AMHA 0628
0MWM
4.8SAV
204.4SAV

Properties (6)

additional_info
SC398526
custom_field_two
2
customer
LACSD
datetime
2020-01-07T02:53:05-08:00
documentation
PRO PIPE
is_lateral_inspection
false