Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 12, 2020, 09:55 AM
  • F 0155_F 0259 _02122020_022735.mp4

Date
02/12/2020
W/O
808145
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00043
PipeID
P10289
Time
1:55 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7453
Sewer Name
F JOINT OUTFALL F - UNIT 7A
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_808145_TV02202_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Width
51 in.
Upstream MH
F 0155
Downstream MH
F 0259
Dir. of Survey
Downstream
Length Surveyed
421 ft.
Total Length
421.1 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
415
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
420
Pipe schematic from manhole F 0155 to F 0259
MH: F 0155MH: F 0259downstream0 ft. MGO - General Observation - MAG COAT0 ft. MWL - Water Level, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 01550 ft. MWM - Water Mark, 75 %of cross sectional area6.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start420.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish420.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish421.1 ft. AMH - Downstream Manhole, Survey Ends - F 0259

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MGOMAG COAT
420.7SSS
6.9SAP
0MWL
0AMHF 0155
6.9SSS
0MWM
421.1AMHF 0259
420.8SAP

Properties (7)

additional_info
SC398857
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
LACSD
datetime
2020-02-12T01:55:16-08:00
documentation
PROPIPE
is_lateral_inspection
false