Wastewater/Activity/PacpInspection/1.0Feb 18, 2020, 10:48 AM
  • 14 0241_14 0240 _02182020_031310.mp4

Date
02/18/2020
W/O
808207
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18294
Time
2:48 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7411
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_808207_TV14071_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0241
Downstream MH
14 0240
Dir. of Survey
Downstream
Length Surveyed
598.9 ft.
Total Length
598.9 ft.
Structural Index
3
Structural Quick
3W2W
Structural Rating
595
O&M Index
2
O&M Quick
412W
O&M Rating
242
Overall Index
2
Overall Quick
Overall Rating
837
Pipe schematic from manhole 14 0241 to 14 0240
MH: 14 0241MH: 14 0240downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02410 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start596.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish596.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish596.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish598.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0240

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWL
2SAP
2SSS
596.8SAP
0AMH14 0241
598.9AMH14 0240
0MWM
2DAGS
596.8DAGS
596.8SSS

Properties (6)

additional_info
SC398800
custom_field_two
2
customer
LACSD
datetime
2020-02-18T02:48:17-08:00
documentation
PRO PIPE
is_lateral_inspection
false