Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 2, 2020, 11:06 AM
  • 15 0752_15 0751_322020_031235.mp4

Date
03/02/2020
W/O
0813511
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00593
PipeID
P12952
Time
3:06 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1372
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
20200226MDM_ARCADIA_SIERRA_MADRE_TRUNK_SECTS_2_5
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
15 0752
Downstream MH
15 0751
Dir. of Survey
Downstream
Length Surveyed
328.7 ft.
Total Length
328.7 ft.
Structural Index
3
Structural Quick
4222
Structural Rating
12
O&M Index
3
O&M Quick
4131
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
22
Pipe schematic from manhole 15 0752 to 15 0751
MH: 15 0752MH: 15 0751downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG46.1 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - 30% ROOTS49.4 ft. SAM - Surface Aggregate Missing, from 09 to 11 o'clock, within 8 inches of joint: YES - DEEP PEELING CONCRETE82.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped88.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open116.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHEC155 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Capped158 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open163.3 ft. RFJ - Roots Fine Joint, from 07 to 09 o'clock, within 8 inches of joint: YESR - 3%185.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open232.2 ft. RMJ - Roots Medium Joint, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YESR328.2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG328.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED328.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active328.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active328.7 ft. AMH - Downstream Manhole, Survey Ends - 3:45AM

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 09 to 11 o'clock, within 8 inches of joint: YES - DEEP PEELING CONCRETE

    49.4 ft. - Surface Aggregate Missing, from 09 to 11 o'clock, within 8 inches of joint: YES - DEEP PEELING CONCRETE

  • Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open

    88.9 ft. - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open

  • Roots Medium Joint, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YESR

    232.2 ft. - Roots Medium Joint, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YESR

Observations (21)

DistanceCodeObservation
328.2SAMSEVERE AGG
116.2SSSPEELING CONCRETE SEVERE AGG ATTACHEC
158TFOpen
328.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
0MWL
155TFCCapped
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
328.7AMH3:45AM
2SAMSEVERE AGG
88.9TFOpen
46.1TFD30% ROOTS
328.2MGOConn. @ Mh, 9 O' Clock. Active
232.2RMJ
82.4TFCCapped
163.3RFJ3%
49.4SAMDEEP PEELING CONCRETE
0MWM
0MGOConn. @ Mh, 3 O' Clock. OPEN
185.4TFOpen
0AMH3:15AM
328.2MGOConn. @ Mh, 3 O' Clock. Active

Properties (6)

custom_field_three
DEEP PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
1
customer
LACSD
datetime
2020-03-02T03:06:42-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false