Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 12, 2020, 11:04 AM
  • 02 2092_02 1846_02122020_032733.mp4

Date
02/12/2020
W/O
808062
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00283
PipeID
P04193
Time
3:04 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7356
Sewer Name
02 MONTEBELLO INTERCEPTOR TRUNK, SECTS 1&2
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_808062_TV02214_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
02 2092
Downstream MH
02 1846
Dir. of Survey
Downstream
Length Surveyed
591.3 ft.
Total Length
591.3 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
3
O&M Quick
4123
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole 02 2092 to 02 1846
MH: 02 2092MH: 02 1846downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 20920 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start56.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start170.4 ft. LL - Alignment Left, 20 %564.3 ft. LL - Alignment Left, 15 %591.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish591.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish591.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1846591.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish591.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (6)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    56.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Left, 20 %

    170.4 ft. - Alignment Left, 20 %

  • Alignment Left, 15 %

    564.3 ft. - Alignment Left, 15 %

Observations (14)

DistanceCodeObservation
591.3DAGS
564.3LL
591.3SSS
0AMH02 2092
591.3AMH02 1846
591.3SAV
8SAV
56.5SAP
2SSS
170.4LL
0MWL
0MWM
591.3SAP
2DAGS

Properties (6)

custom_field_two
3
customer
LACSD
datetime
2020-02-12T03:04:23-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30160