Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2020, 08:05 AM
  • 02 0926_02 0925_02052020_003232.mp4

Date
02/05/2020
W/O
808148
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00252
PipeID
P03494
Time
12:05 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7251
Sewer Name
02 DOWNEY-BELLFLOWER DIVERSION TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
25
Purpose
Routine Assessment
Project
RFIR_WO_808148_TV02380_JAN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
02 0926
Downstream MH
02 0925
Dir. of Survey
Downstream
Length Surveyed
283.5 ft.
Total Length
283.5 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
168
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
168
Pipe schematic from manhole 02 0926 to 02 0925
MH: 02 0926MH: 02 0925downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 09260 ft. MWM - Water Mark, 45 %of cross sectional area3.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start283 ft. MGO - General Observation - Surface Spalling, from 9 to 3 oclock, throughout the reach.283.5 ft. AMH - Downstream Manhole, Survey Ends - 02 0925283.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
3.9CM
0MWL
0AMH02 0926
0MWM
283MGOSurface Spalling, from 9 to 3 oclock, throughout the reach.
283.5AMH02 0925
283.5CM

Properties (6)

additional_info
SC398851
custom_field_two
3
customer
LACSD
datetime
2020-02-05T00:05:58-08:00
documentation
PROPIPE
is_lateral_inspection
false