- Date
- 02/04/2020
- W/O
- 808075
- Weather
- Dry
- Operator/Surveyor
- B.FUGATE
- Sewer ID
- Z00879
- PipeID
- P17983
- Time
- 2:45 AM
- Certificate
- U-508-7069
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K7250
- Sewer Name
- 30 SOUTH BAY CITIES MAIN EXT #3 RELIEF TRUNK
- City
- REDONDO BEACH
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 30
- Page No.
- 06
- Purpose
- Routine Assessment
- Project
- RFIR_WO_808075_TV30037_JAN2020
- Sewer Type
- Gravity
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 21 in.
- Width
- 21 in.
- Upstream MH
- 30 0332
- Downstream MH
- 30 0331
- Dir. of Survey
- Downstream
- Length Surveyed
- 553.4 ft.
- Total Length
- 553.4 ft.
- Structural Index
- 3
- Structural Quick
- 3U2U
- Structural Rating
- 550
- O&M Index
- 2
- O&M Quick
- 3C2U
- O&M Rating
- 274
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 824
Pipe schematic from manhole 30 0332 to 30 0331 Observation photos (2)

2.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

123.2 ft. - Deposits Settled Other, 20 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start