Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2020, 05:59 AM
  • 05 1043_05 1042 _02102020_221127.mp4

Date
02/10/2020
W/O
808107
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00424
PipeID
P06278
Time
9:59 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7254
Sewer Name
05 AVIATION BOULEVARD RELIEF TRUNK
City
EL SEGUNDO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_808107_TV05177_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
05 1043
Downstream MH
05 1042
Dir. of Survey
Downstream
Length Surveyed
335.9 ft.
Total Length
335.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 1043 to 05 1042
MH: 05 1043MH: 05 1042downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 10430 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area3.9 ft. MGO - General Observation - MAG COAT3.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"35.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start335.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1042335.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    35.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0AMH05 1043
0MWL
335.9SAV
0MWM
3.9MGOMAG COAT
3.9SAV
335.9AMH05 1042
335.9SSS
31TF
35.7SSS
335.9MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC398854
custom_field_two
3
customer
LACSD
datetime
2020-02-10T21:59:43-08:00
documentation
PROPIPE
is_lateral_inspection
false