Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 30, 2020, 11:18 AM
  • 22 0240_22 0239 _01302020_033340.mp4

Date
01/30/2020
W/O
808209
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16522
Time
3:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7292
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_808209_TV22160_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0239
Downstream MH
22 0240
Dir. of Survey
Upstream
Length Surveyed
236.1 ft.
Total Length
236.1 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
230
O&M Index
2
O&M Quick
412H
O&M Rating
96
Overall Index
2
Overall Quick
Overall Rating
326
Pipe schematic from manhole 22 0239 to 22 0240
MH: 22 0239MH: 22 0240upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02400 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN1.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE1.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish46.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"49.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"99.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN102.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"153.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"212 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"234.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start234.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start234.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start236.1 ft. MWL - Water Level, 15 %of cross sectional area236.1 ft. AMH - Downstream Manhole, Survey Begins - 22 0239236.1 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    234.4 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (19)

DistanceCodeObservation
2SSS
234.4DAGS
133.9TFC
186.4TFC
2SAP
189.6TFC
234.4SSS
234.4MGOCOCKROACHES IN MANHOLE
82.7TFC
0MWL
234.4SAP
2DAGS
24.1TFC
0AMH22 0239
236.1AMH22 0240
0MWM
236.1MGOCONN @ MH 3 O'CLOCK/OPEN
85.7TFC
136.8TFOPEN

Properties (6)

additional_info
SC398778
custom_field_two
2
customer
LACSD
datetime
2020-01-30T03:18:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false