Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 30, 2020, 10:51 AM
  • 22 0238_22 0237 _01302020_030448.mp4

Date
01/30/2020
W/O
808209
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16520
Time
2:51 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7292
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_808209_TV22160_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0238
Downstream MH
22 0237
Dir. of Survey
Downstream
Length Surveyed
379.9 ft.
Total Length
379.9 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
375
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
525
Pipe schematic from manhole 22 0238 to 22 0237
MH: 22 0238MH: 22 0237downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02382 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG THROUGHOUT45.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"91.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN94.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"115.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"143.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"191.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"209.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"324.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN349.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"377.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish377.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish377.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish379.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE379.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0237379.9 ft. MGO - General Observation - CONN@ MH 3 O' CLOCK/OPEN

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
377.9SSS
45.5TFC
0MWL
2DAGS
248.9TFA
379.9MGOCONN @ MH 9 O'CLOCK/ACTIVE
209.9TFC
349.2TFC
115.9TFA
143.5TFC
0MGOCONN @ MH 3 O'CLOCK/OPEN
0MWM
379.9AMH22 0237
2SAP
0AMH22 0238
300.8TFC
324.3TFOPEN
91.2TFOPEN
377.9DAGS
94.8TFA
2SSS
377.9SAP
2MGO70% MAG THROUGHOUT
379.9MGOCONN@ MH 3 O' CLOCK/OPEN
191.4TFC

Properties (6)

additional_info
SC398778
custom_field_two
2
customer
LACSD
datetime
2020-01-30T02:51:47-08:00
documentation
PRO PIPE
is_lateral_inspection
false