Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 30, 2020, 09:40 AM
  • 22 0233_22 0232 _01302020_015627.mp4

Date
01/30/2020
W/O
808209
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16514
Time
1:40 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7292
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_808209_TV22160_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0233
Downstream MH
22 0232
Dir. of Survey
Downstream
Length Surveyed
392.2 ft.
Total Length
392.2 ft.
Structural Index
3
Structural Quick
513O
Structural Rating
395
O&M Index
2
O&M Quick
2O00
O&M Rating
156
Overall Index
2
Overall Quick
Overall Rating
551
Pipe schematic from manhole 22 0233 to 22 0232
MH: 22 0233MH: 22 0232downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02330 ft. MWL - Water Level, 15 %of cross sectional area0.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0.1 ft. MGO - General Observation - CONN @ MH @ 3 O' CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. MGO - General Observation - 70% MAG THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"56.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN93.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"165.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN177.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"213.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN225.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"261.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"273.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"309.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE321.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"357.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN369.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"390.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish390.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish390.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish392.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0232

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (27)

DistanceCodeObservation
177.8TFC
225.6TFA
357.5TFOPEN
93.2TFC
2DAGS
321.3TFA
390.5SSS
213.3TFOPEN
0.1MGOCONN @ MH 9 O'CLOCK/UNKNOWN
56.8TFOPEN
2SRV
2MGO70% MAG THROUGHOUT
165.3TFOPEN
44.7TFC
390.5SAP
369.4TFA
273.7TFC
0MWM
0AMH22 0233
0.1MGOCONN @ MH @ 3 O' CLOCK/ACTIVE
392.2AMH22 0232
390.5DAGS
0MWL
2SAP
261.6TFC
2SSS
309.8TFACTIVE

Properties (6)

additional_info
SC398778
custom_field_two
2
customer
LACSD
datetime
2020-01-30T01:40:35-08:00
documentation
PRO PIPE
is_lateral_inspection
false