Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 3, 2016, 07:26 AM
  • 08 0308_08 0307_1032016_004132.mp4

Date
10/03/2016
W/O
0591702
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00013
PipeID
P00354
Time
12:26 AM
Certificate
101406022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0304
Sewer Name
08 KEYSTONE TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20160930MDM_KEYSTONE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
08 0308
Downstream MH
08 0307
Dir. of Survey
Downstream
Length Surveyed
314.8 ft.
Total Length
314.8 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
58
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
58
Pipe schematic from manhole 08 0308 to 08 0307
MH: 08 0308MH: 08 0307downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:30AM5.5 ft. FS - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES, Start - SLIGHT5.5 ft. FS - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT9.4 ft. FC - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES - H16.5 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES - H16.6 ft. FC - Fracture Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES - H23 ft. FC - Fracture Circumferential, from 08 to 03 o'clock, within 8 inches of joint: YES - SLIGHT23.1 ft. FC - Fracture Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES - H23.1 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - H25.2 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES - H30.7 ft. FC - Fracture Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES - H30.8 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - H37.7 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - H37.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped37.7 ft. FL - Fracture Longitudinal, at 08 TO 4 o'clock, within 8 inches of joint: YES, Start - HAIRLINE AT JOINTS37.7 ft. FL - Fracture Longitudinal, at 08 TO 4 o'clock, within 8 inches of joint: YES, Start - SLIGHT AT JOINTS37.7 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - H37.7 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - HAIRLINE AT JOINTS37.7 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AT JOINYS45.7 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: NO - SLIGHT72.4 ft. FS - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: NO - S86.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped134.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped188.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open196.2 ft. FS - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - H196.2 ft. FS - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES, Finish - SLIGHT196.2 ft. FS - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Finish - SLIGHT196.2 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - H238.7 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - H238.7 ft. FS - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - S238.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped253.2 ft. FS - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES, Start - S253.2 ft. FS - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Finish - H284 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped314 ft. FS - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Finish - S314 ft. FS - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES, Finish - S314.2 ft. FC - Fracture Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish314.3 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped314.3 ft. FL - Fracture Longitudinal, at 08 TO 4 o'clock, within 8 inches of joint: YES, Finish - 30% HAIRLINE314.3 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 20% SLIGHT314.3 ft. FL - Fracture Longitudinal, at 08 TO 4 o'clock, within 8 inches of joint: YES, Finish - 29% SLIGHT314.3 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 40% HAIRLINE314.8 ft. AMH - Downstream Manhole, Survey Ends - 2:00AM

Observation photos (8)

  • Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    5.5 ft. - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    5.5 ft. - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: NO - SLIGHT

    45.7 ft. - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: NO - SLIGHT

  • Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: NO - S

    72.4 ft. - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: NO - S

  • Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - H

    196.2 ft. - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - H

  • Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - H

    196.2 ft. - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - H

  • Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - S

    238.7 ft. - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - S

  • Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES, Start - S

    253.2 ft. - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES, Start - S

Observations (46)

DistanceCodeObservation
37.7FCH
86.9TFCCapped
188.7TFOpen
314.8AMH2:00AM
314.3MGOConn. @ Mh, 9 O' Clock. Capped
37.7TFCCapped
9.4FCH
37.7FLHAIRLINE AT JOINTS
0MWL
0MGOConn. @ Mh, 3 O' Clock. Active
23.1FCH
0MWM
25.2FCH
284TFCCapped
314.3FL30% HAIRLINE
314.3FC20% SLIGHT
196.2FSH
196.2FSSLIGHT
196.2FSSLIGHT
72.4FSS
0AMH12:30AM
238.7FSH
37.7FLSLIGHT AT JOINTS
238.7FSS
238.7TFCCapped
314FSS
134.1TFCCapped
23FCSLIGHT
314.3FL29% SLIGHT
5.5FSSLIGHT
196.2FSH
253.2FSS
37.7FLH
253.2FSH
314FSS
16.6FCH
314.3FC40% HAIRLINE
23.1FCH
30.8FLH
5.5FSSLIGHT
37.7FCHAIRLINE AT JOINTS
37.7FCSLIGHT AT JOINYS
30.7FCH
45.7FSSLIGHT
314.2FC
16.5FCH

Properties (6)

custom_field_three
SLIGHT SPIRAL FRACTURE JOINT TO JOINT LONGER
custom_field_two
2
customer
LACSD
datetime
2016-10-03T00:26:55-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false