29 0117_29 0087_9192016_091334.mp4
8.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO
59.3 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES
125.2 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES
185.8 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - DEFECTIVE/BROKEN
207.4 ft. - Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: YES
261.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES
276.2 ft. - Upstream Manhole, Survey Ends - 10:00AM
| Distance | Code | Observation |
|---|---|---|
| 34.5 | TFA | — |
| 235.4 | TFA | — |
| 177.9 | TF | Open |
| 243.3 | TFA | — |
| 232.8 | TFC | — |
| 17.6 | CM | — |
| 0 | MWM | — |
| 8.3 | DAGS | — |
| 276.2 | AMH | 10:00AM |
| 0 | MWL | — |
| 88.1 | TF | Open |
| 0 | AMH | 09:00AM |
| 156.6 | TFC | — |
| 185.8 | TFC | DEFECTIVE/BROKEN |
| 133 | TFA | — |
| 204.7 | CL | — |
| 0 | MGO | CONNECTION AT MH, 9 OCLOCK, ACTIVE |
| 58.6 | TF | Open |
| 146 | CM | — |
| 228 | CM | — |
| 59.3 | CL | — |
| 261.5 | CM | — |
| 208.7 | TFC | — |
| 125.2 | CM | — |
| 124.6 | TFA | — |
| 206.9 | TFA | — |
| 247.9 | CM | — |
| 183.2 | TFA | — |
| 207.4 | SSS | — |