Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2016, 03:54 PM
  • 29 0117_29 0087_9192016_091334.mp4

Date
09/19/2016
W/O
0586011
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00273
PipeID
P23906
Time
8:54 AM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7235
Sewer Name
29 33RD STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Capital Improvement Program Assesment
Project
20160919MI_33_RD_STREET_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0087
Downstream MH
29 0117
Dir. of Survey
Upstream
Length Surveyed
276.2 ft.
Total Length
276.2 ft.
Structural Index
3
Structural Quick
3623
Structural Rating
24
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
26
Pipe schematic from manhole 29 0087 to 29 0117
MH: 29 0087MH: 29 0117upstream0 ft. AMH - Upstream Manhole, Survey Ends - 10:00AM14.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES28.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES32.9 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"40.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"43.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"48.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES67.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 6"68.8 ft. SSS - Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: YES69.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"71.5 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES90.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - DEFECTIVE/BROKEN93 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"98.3 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6" - Open119.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 6"130.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES143.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"151 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES151.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"188.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open216.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES217.6 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Open241.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"258.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES267.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO276.2 ft. MWM - Water Mark, 20 %of cross sectional area276.2 ft. MWL - Water Level, 10 %of cross sectional area276.2 ft. AMH - Downstream Manhole, Survey Begins - 09:00AM276.2 ft. MGO - General Observation - CONNECTION AT MH, 9 OCLOCK, ACTIVE

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO

    8.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    59.3 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    125.2 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - DEFECTIVE/BROKEN

    185.8 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - DEFECTIVE/BROKEN

  • Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: YES

    207.4 ft. - Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    261.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Upstream Manhole, Survey Ends - 10:00AM

    276.2 ft. - Upstream Manhole, Survey Ends - 10:00AM

Observations (29)

DistanceCodeObservation
34.5TFA
235.4TFA
177.9TFOpen
243.3TFA
232.8TFC
17.6CM
0MWM
8.3DAGS
276.2AMH10:00AM
0MWL
88.1TFOpen
0AMH09:00AM
156.6TFC
185.8TFCDEFECTIVE/BROKEN
133TFA
204.7CL
0MGOCONNECTION AT MH, 9 OCLOCK, ACTIVE
58.6TFOpen
146CM
228CM
59.3CL
261.5CM
208.7TFC
125.2CM
124.6TFA
206.9TFA
247.9CM
183.2TFA
207.4SSS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-09-19T08:54:12-07:00
documentation
IGNACIO, FRANKLIN, SHADLER, BRAR
is_lateral_inspection
false