Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2016, 12:23 PM
  • 05 0878_05 0877_9192016_052559.mp4

Date
09/19/2016
W/O
0585472
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00457
PipeID
P06109
Time
5:23 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0285
Sewer Name
05 IMPERIAL HIGHWAY EXTENSION TRUNK
City
LENNOX
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
09
Purpose
Routine Assessment
Project
20160919MDM_IMPERIAL_HIGHWAY_EXTENSION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
05 0878
Downstream MH
05 0877
Dir. of Survey
Downstream
Length Surveyed
334.9 ft.
Total Length
334.9 ft.
Structural Index
3
Structural Quick
4331
Structural Rating
29
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
31
Pipe schematic from manhole 05 0878 to 05 0877
MH: 05 0878MH: 05 0877downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Capped0 ft. AMH - Upstream Manhole, Survey Begins - 5:25AM0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area6.8 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES - HAIRLINE7.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active8.4 ft. RPP - Repair Patch, from 08 to 02 o'clock, within 8 inches of joint: NO - CONCRETE BACKES13 ft. RPP - Repair Patch, from 08 to 04 o'clock, within 8 inches of joint: YES - CONCRETE BACKED17.3 ft. FC - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES - HAIRLINE26.4 ft. FC - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES - H32.5 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - H104.8 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active118.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped120.3 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - H121.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped134.7 ft. MGO - General Observation - 10" VCP220.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - H220.3 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - H232.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES232.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active235.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped285.9 ft. RPPD - Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL285.9 ft. RPPD - Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL LOOSE285.9 ft. RPPD - Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL301.3 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES - H334.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped334.9 ft. AMH - Downstream Manhole, Survey Ends - 6:00AM

Observation photos (6)

  • Repair Patch, from 08 to 02 o'clock, within 8 inches of joint: NO - CONCRETE BACKES

    8.4 ft. - Repair Patch, from 08 to 02 o'clock, within 8 inches of joint: NO - CONCRETE BACKES

  • Repair Patch, from 08 to 04 o'clock, within 8 inches of joint: YES - CONCRETE BACKED

    13 ft. - Repair Patch, from 08 to 04 o'clock, within 8 inches of joint: YES - CONCRETE BACKED

  • General Observation - 10" VCP

    134.7 ft. - General Observation - 10" VCP

  • Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL

    285.9 ft. - Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL

  • Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL LOOSE

    285.9 ft. - Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL LOOSE

  • Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL

    285.9 ft. - Repair Patch Defective, from 10 to 02 o'clock, within 8 inches of joint: YES - METAL

Observations (28)

DistanceCodeObservation
301.3FCH
0MGOConn. @ Mh, 3 O' Clock. Capped
7.4TBActive
285.9RPPDMETAL
220.3FLH
120.3FCH
285.9RPPDMETAL LOOSE
0AMH5:25AM
121.5TFCCapped
334.5MGOConn. @ Mh, 9 O' Clock. Capped
235.7TFCCapped
8.4RPPCONCRETE BACKES
0MGOConn. @ Mh, 9 O' Clock. Capped
334.9AMH6:00AM
17.3FCHAIRLINE
118.6TFCCapped
13RPPCONCRETE BACKED
0MWL
32.5FCH
232.3DAGS
6.8FCHAIRLINE
26.4FCH
232.3TFActive
220.3FCH
104.8TBActive
134.7MGO10" VCP
0MWM
285.9RPPDMETAL

Properties (6)

custom_field_three
METAL POINT REPAIR LOOSE-HAIRLINE FRACTURES
custom_field_two
4
customer
LACSD
datetime
2016-09-19T05:23:52-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false