Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 14, 2016, 06:03 PM
  • 02 0716_02 0715_9142016_110435.mp4

Date
09/14/2016
W/O
0591680
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00294
PipeID
P03267
Time
11:03 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7233
Sewer Name
02 OLD RIVER SCHOOL RD. TRUNK, SECTS 1&2
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
29
Purpose
Capital Improvement Program Assesment
Project
20160914AM_OLD_RIVER_SCHOOL_ROAD_TRUNK_SECTS_1_2
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 0716
Downstream MH
02 0715
Dir. of Survey
Downstream
Length Surveyed
234.9 ft.
Total Length
234.9 ft.
Structural Index
3
Structural Quick
413A
Structural Rating
48
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
52
Pipe schematic from manhole 02 0716 to 02 0715
MH: 02 0716MH: 02 0715downstream0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 09 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:03 AM3 ft. MGO - General Observation - CHIPPING ON THE BARREL OF THE PIPE33.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"33.3 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Start35.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"39.7 ft. MWL - Water Level, 10 %of cross sectional area39.7 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Finish39.7 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start42.9 ft. CM - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES45.6 ft. B - Broken, at 11 o'clock, within 8 inches of joint: YES48.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish48.5 ft. B - Broken, at 01 o'clock, within 8 inches of joint: YES, Start51.9 ft. MGP - General Photograph - BROKEN PIPE54.7 ft. MGP - General Photograph - BROKEN PIPE54.7 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES58.1 ft. MGP - General Photograph - BROKEN PIPE64.5 ft. FM - Fracture Multiple, from 12 to 02 o'clock, within 8 inches of joint: YES64.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start64.5 ft. B - Broken, at 01 o'clock, within 8 inches of joint: YES, Finish79.6 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish84.3 ft. MWL - Water Level, 35 %of cross sectional area101.1 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES109.6 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES111.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start113.3 ft. B - Broken, at 12 o'clock, within 8 inches of joint: YES, Start115.6 ft. MGP - General Photograph - BROKEN PIPE118.9 ft. MGP - General Photograph - BROKEN PIPE125.2 ft. B - Broken, at 12 o'clock, within 8 inches of joint: YES, Finish137.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish151.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"151.9 ft. CM - Crack Multiple, from 10 to 01 o'clock, within 8 inches of joint: YES154 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"173.6 ft. B - Broken, at 10 o'clock, within 8 inches of joint: YES176.6 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES188.9 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES191.8 ft. CM - Crack Multiple, from 11 to 02 o'clock, within 8 inches of joint: YES234.8 ft. MGO - General Observation - SLIGHT GREASE THROUGHOUT THE REACH234.8 ft. MGO - General Observation - UNKNOWN CONN. INSIDE THE MH. @ 09 O'CLOCK234.8 ft. MGO - General Observation - ROACHES INSIDE THE MH.234.8 ft. MGO - General Observation - CAPPED CONN. INSIDE THE MH. @ 12 O'CLOCK234.9 ft. AMH - Downstream Manhole, Survey Ends - 11:42 AM, PIPE DROPS INTO THE MH.

Observation photos (17)

  • General Observation - CHIPPING ON THE BARREL OF THE PIPE

    3 ft. - General Observation - CHIPPING ON THE BARREL OF THE PIPE

  • Water Level, 10 %of cross sectional area

    39.7 ft. - Water Level, 10 %of cross sectional area

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    39.7 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Broken, at 11 o'clock, within 8 inches of joint: YES

    45.6 ft. - Broken, at 11 o'clock, within 8 inches of joint: YES

  • Broken, at 01 o'clock, within 8 inches of joint: YES, Start

    48.5 ft. - Broken, at 01 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - BROKEN PIPE

    51.9 ft. - General Photograph - BROKEN PIPE

  • General Photograph - BROKEN PIPE

    54.7 ft. - General Photograph - BROKEN PIPE

  • General Photograph - BROKEN PIPE

    58.1 ft. - General Photograph - BROKEN PIPE

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    64.5 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Water Level, 35 %of cross sectional area

    84.3 ft. - Water Level, 35 %of cross sectional area

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    111.3 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Broken, at 12 o'clock, within 8 inches of joint: YES, Start

    113.3 ft. - Broken, at 12 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - BROKEN PIPE

    115.6 ft. - General Photograph - BROKEN PIPE

  • General Photograph - BROKEN PIPE

    118.9 ft. - General Photograph - BROKEN PIPE

  • Crack Multiple, from 10 to 01 o'clock, within 8 inches of joint: YES

    151.9 ft. - Crack Multiple, from 10 to 01 o'clock, within 8 inches of joint: YES

  • Broken, at 10 o'clock, within 8 inches of joint: YES

    173.6 ft. - Broken, at 10 o'clock, within 8 inches of joint: YES

  • Downstream Manhole, Survey Ends - 11:42 AM, PIPE DROPS INTO THE MH.

    234.9 ft. - Downstream Manhole, Survey Ends - 11:42 AM, PIPE DROPS INTO THE MH.

Observations (45)

DistanceCodeObservation
42.9CM
154TFC
137.3FL
234.9AMH11:42 AM, PIPE DROPS INTO THE MH.
58.1MGPBROKEN PIPE
33.3TFC
173.6B
3MGOCHIPPING ON THE BARREL OF THE PIPE
39.7MWL
39.7CL
84.3MWL
113.3B
48.5FL
101.1CM
0MGOROACHES INSIDE THE MH.
151.1TFC
234.8MGOSLIGHT GREASE THROUGHOUT THE REACH
234.8MGOUNKNOWN CONN. INSIDE THE MH. @ 09 O'CLOCK
35.9TFC
111.3FL
54.7MGPBROKEN PIPE
0MGOACTIVE CONN. INSIDE THE MH. @ 09 O'CLOCK
79.6FL
151.9CM
234.8MGOROACHES INSIDE THE MH.
48.5B
0MWM
118.9MGPBROKEN PIPE
54.7CL
109.6CM
234.8MGOCAPPED CONN. INSIDE THE MH. @ 12 O'CLOCK
125.2B
0MWL
115.6MGPBROKEN PIPE
191.8CM
0AMH11:03 AM
176.6CL
45.6B
51.9MGPBROKEN PIPE
64.5FM
64.5FL
33.3CL
188.9CL
64.5B
39.7FL

Properties (7)

additional_info
RFIR INSPECTION
custom_field_three
BROKEN PIPE
custom_field_two
1
customer
LACSD
datetime
2016-09-14T11:03:00-07:00
documentation
MIRANDA, SHADLER, FRANKLIN, BRAR
is_lateral_inspection
false