Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 8, 2016, 07:32 AM
  • 05 1960_05 1959_982016_004645.mp4

Date
09/08/2016
W/O
0585481
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00503
PipeID
P07486
Time
12:32 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0269
Sewer Name
05 PALOS VERDES NORTH SLOPE TRUNK, SECTS 2&3
City
PALOS VERDES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
34
Purpose
Routine Assessment
Project
20160906MDM_PALOS_VERDES_NORTH_SLOPE_TRUNK_SECTS_2_3
Material
Vitrified Clay Pipe
Shape
Circular
Height
14 in.
Upstream MH
05 1959
Downstream MH
05 1960
Dir. of Survey
Upstream
Length Surveyed
408.5 ft.
Total Length
408.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 05 1959 to 05 1960
MH: 05 1959MH: 05 1960upstream0 ft. AMH - Upstream Manhole, Survey Ends - 1:00AM19.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open156.9 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped191.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open346.8 ft. MGO - General Observation - 14" VCP-CIPP408.5 ft. MWM - Water Mark, 30 %of cross sectional area408.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active408.5 ft. MWL - Water Level, 5 %of cross sectional area408.5 ft. AMH - Downstream Manhole, Survey Begins - 12:35AM

Observation photos (1)

  • General Observation - 14" VCP-CIPP

    61.7 ft. - General Observation - 14" VCP-CIPP

Observations (9)

DistanceCodeObservation
0MWM
217.1TBOpen
61.7MGO14" VCP-CIPP
0MGOConn. @ Mh, 9 O' Clock. Active
0MWL
251.6TBCCapped
388.9TBOpen
408.5AMH1:00AM
0AMH12:35AM

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2016-09-08T00:32:07-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false
lining
CIPP