Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 2, 2016, 03:50 PM
  • 19 0197_19 0196_922016_085827.mp4

Date
09/02/2016
W/O
0591703
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00726
PipeID
P15166
Time
8:50 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7222
Sewer Name
19 NORWALK BOULEVARD TRUNK
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
20160902AM_NORWALK_BOULEVARD_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
19 0196
Downstream MH
19 0197
Dir. of Survey
Upstream
Length Surveyed
235.3 ft.
Total Length
235.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
4124
O&M Rating
12
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 19 0196 to 19 0197
MH: 19 0196MH: 19 0197upstream0 ft. AMH - Upstream Manhole, Survey Ends - 9:18 AM1.2 ft. MGO - General Observation - ROACHES INSIDE THE MH.2.1 ft. MGO - General Observation - SLIGHT DEBRIS THROUGHOUT THE REACH2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish - POSSIBLE CALCIUM/SCALE10 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: NO10 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 4" - OPEN10 ft. IS - Infiltration Stain, at 01 o'clock, within 8 inches of joint: NO29.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"57.7 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 4" - OPEN57.7 ft. IS - Infiltration Stain, at 01 o'clock, within 8 inches of joint: NO57.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: NO81.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"102.6 ft. MWL - Water Level, 35 %of cross sectional area113.3 ft. IR - Infiltration Runner, at 01 o'clock, within 8 inches of joint: NO113.3 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"128 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"159.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES159.6 ft. IS - Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES160.3 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"191.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"233.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE CALCIUM/SCALE235.3 ft. MGO - General Observation - ROACHES INSIDE THE MH.235.3 ft. MWL - Water Level, 25 %of cross sectional area235.3 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK235.3 ft. MWM - Water Mark, 35 %of cross sectional area235.3 ft. AMH - Downstream Manhole, Survey Begins - 9:00 AM

Observation photos (10)

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - POSSIBLE CALCIUM/SCALE

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE CALCIUM/SCALE

  • Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"

    44.1 ft. - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"

    75 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock,  , within 8 inches of joint: YES

    75.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES

  • Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES

    75.7 ft. - Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES

  • Infiltration Runner, at 01 o'clock, within 8 inches of joint: NO

    122 ft. - Infiltration Runner, at 01 o'clock, within 8 inches of joint: NO

  • Water Level, 35 %of cross sectional area

    132.7 ft. - Water Level, 35 %of cross sectional area

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock,  , within 8 inches of joint: NO

    177.6 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: NO

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock,  , within 8 inches of joint: NO

    225.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: NO

  • Infiltration Stain, at 01 o'clock, within 8 inches of joint: NO

    225.3 ft. - Infiltration Stain, at 01 o'clock, within 8 inches of joint: NO

Observations (26)

DistanceCodeObservation
177.6TBOPEN
75TBA
132.7MWL
107.3TFC
225.3DAE
233.2MGOSLIGHT DEBRIS THROUGHOUT THE REACH
75.7DAE
122IR
177.6IS
44.1TFC
233.2DAGSPOSSIBLE CALCIUM/SCALE
0MGOROACHES INSIDE THE MH.
177.6DAE
205.6TFC
0MWL
2DAGSPOSSIBLE CALCIUM/SCALE
235.3AMH9:18 AM
122TBA
0MGOACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK
0MWM
234.1MGOROACHES INSIDE THE MH.
225.3TBOPEN
75.7IS
153.7TFC
225.3IS
0AMH9:00 AM

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2016-09-02T08:50:05-07:00
documentation
MIRANDA, FRANKLIN, SHADLER, BRAR
is_lateral_inspection
false