05 0298_05 0297_2192020_021720.mp4
2 ft. - General Observation - MAG COAT 40% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
39.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
108.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
230.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 328.3 | SAV | SEVERE AGG |
| 2 | MGO | MAG COAT 40% START |
| 230.2 | SAP | SEVERE AGG |
| 0 | MWM | — |
| 2 | SSS | BLISTERING CONCRETE |
| 108.7 | SAP | SEVERE AGG |
| 0 | MWL | — |
| 0 | AMH | 2:15AM |
| 328.3 | SAP | SEVERE AGG |
| 39.4 | SAV | SEVERE AGG |
| 328.3 | SSS | BLISTERING CONCRETE |
| 146.2 | MGO | 40% MAG COAT FINISH |
| 328.9 | AMH | 2:40AM |
| 2 | SAV | SEVERE AGG |