Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 13, 2020, 09:54 AM
  • 08 0000_08 0646_2132020_054209.mp4

Date
02/13/2020
W/O
0813495
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00561
PipeID
P21470
Time
1:54 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1357
Sewer Name
08 MAIN STREET P.P. INFLUENT SEWER
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20200213MDM_MAIN_STREET_P_P_INFLUENT_SEWER
Material
CIP
Shape
Circular
Height
30 in.
Upstream MH
08 0000
Downstream MH
08 0646
Dir. of Survey
Downstream
Length Surveyed
41.9 ft.
Total Length
41.9 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
4
O&M Quick
5131
O&M Rating
8
Overall Index
4
Overall Quick
Overall Rating
14
Pipe schematic from manhole 08 0000 to 08 0646
MH: 08 0000MH: 08 0646downstream0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:40AM0 ft. MWL - Water Level, 80 %of cross sectional area2 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 40% LOSS25.3 ft. DAZ - Deposits Attached Other, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: NO - HARD GREASE OR RUSTED PIPE25.3 ft. MGO - General Observation - ZOOM 17'25.3 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 40% LOSS41.6 ft. MGO - General Observation - ZOOM 17'41.6 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - 40%41.9 ft. AMH - Downstream Manhole, Survey Ends - 6:06AM

Observation photos (6)

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 40% LOSS

    2 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 40% LOSS

  • Deposits Attached Other, 20 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: NO - HARD GREASE OR RUSTED PIPE

    25.3 ft. - Deposits Attached Other, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: NO - HARD GREASE OR RUSTED PIPE

  • General Observation - ZOOM 17'

    25.3 ft. - General Observation - ZOOM 17'

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 40% LOSS

    25.3 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 40% LOSS

  • General Observation - ZOOM 17'

    41.6 ft. - General Observation - ZOOM 17'

  • Downstream Manhole, Survey Ends - 6:06AM

    41.9 ft. - Downstream Manhole, Survey Ends - 6:06AM

Observations (10)

DistanceCodeObservation
2SCP40% LOSS
0MWM
0AMH5:40AM
25.3DAZHARD GREASE OR RUSTED PIPE
25.3MGOZOOM 17'
41.9AMH6:06AM
41.6MGOZOOM 17'
25.3SCP40% LOSS
0MWL
41.6SCP40%

Properties (6)

custom_field_three
40% CIP PIPE LOSS
custom_field_two
1
customer
LACSD
datetime
2020-02-13T01:54:16-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false