- Date
- 02/13/2020
- W/O
- 0813495
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z00561
- PipeID
- P21471
- Time
- 1:51 AM
- Certificate
- U-1014-06022543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H1357
- Sewer Name
- 08 MAIN STREET P.P. INFLUENT SEWER
- City
- CARSON
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 08
- Page No.
- 10
- Purpose
- Capital Improvement Program Assesment
- Project
- 20200213MDM_MAIN_STREET_P_P_INFLUENT_SEWER
- Material
- CIP
- Shape
- Circular
- Height
- 30 in.
- Upstream MH
- 08 0001
- Downstream MH
- 08 0000
- Dir. of Survey
- Downstream
- Length Surveyed
- 14.9 ft.
- Total Length
- 14.9 ft.
- Structural Index
- 3
- Structural Quick
- 3200
- Structural Rating
- 6
- O&M Index
- 5
- O&M Quick
- 5100
- O&M Rating
- 5
- Overall Index
- 4
- Overall Quick
- —
- Overall Rating
- 11
Pipe schematic from manhole 08 0001 to 08 0000 Observation photos (2)

4.5 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 40% LOSS

11.7 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 40%