Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 30, 2020, 07:39 AM
  • H 1296_H 1295 _01292020_235211.mp4

Date
01/29/2020
W/O
808197
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01183
PipeID
P17312
Time
11:39 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7291
Sewer Name
H JOINT OUTFALL H - UNIT 8L
City
AZUSA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_808197_TV22154_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 1296
Downstream MH
H 1295
Dir. of Survey
Downstream
Length Surveyed
409.9 ft.
Total Length
409.9 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
402
O&M Index
2
O&M Quick
2O00
O&M Rating
162
Overall Index
2
Overall Quick
Overall Rating
564
Pipe schematic from manhole H 1296 to H 1295
MH: H 1296MH: H 1295downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - H 12960 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start408.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish408.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish408.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish409.9 ft. AMH - Downstream Manhole, Survey Ends - H 1295

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
6.8SAP
408.1SSS
0MGOCOCKROACHES IN MANHOLE
409.9AMHH 1295
0AMHH 1296
0MGOCONNECTION AT MH 3 O'CLOCK
408.1SAP
0MWM
2DAGS
2SSS
0MWL
408.1DAGS

Properties (6)

additional_info
SC398777
custom_field_two
3
customer
LACSD
datetime
2020-01-29T23:39:46-08:00
documentation
PRO PIPE
is_lateral_inspection
false