Wastewater/Activity/PacpInspection/1.0Jan 30, 2020, 06:12 AM
  • H 1285_H 1284 _01292020_222326.mp4

Date
01/29/2020
W/O
808197
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01183
PipeID
P17301
Time
10:12 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7291
Sewer Name
H JOINT OUTFALL H - UNIT 8L
City
AZUSA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_808197_TV22154_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 1285
Downstream MH
H 1284
Dir. of Survey
Downstream
Length Surveyed
315.4 ft.
Total Length
315.4 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
429
Pipe schematic from manhole H 1285 to H 1284
MH: H 1285MH: H 1284downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 12850 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"59.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"65.1 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"68.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"115.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"219.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"276.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"284.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"312 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish313.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish313.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish315.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE315.4 ft. AMH - Downstream Manhole, Survey Ends - H 1284

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    315.4 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (23)

DistanceCodeObservation
0AMHH 1285
115.6TFC
6.2SSS
312SAV
0MGOCOCKROACHES IN MANHOLE
315.4MGOCOCKROACHES IN MANHOLE
313.6DAGS
219.9TFC
276.1TFC
2DAGS
172.4TFC
0MGOCONNECTION AT MH 3 O'CLOCK
59.7TFC
7SAV
11.8TFC
313.6SSS
284.2TFC
315.4AMHH 1284
65.1TB
0MWL
68.7TFC
0MWM
124.1TB

Properties (6)

additional_info
SC398777
custom_field_two
3
customer
LACSD
datetime
2020-01-29T22:12:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false