Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2019, 12:33 PM
  • 22 0737_22 0736_12092019_Manual.mp4

Date
12/09/2019
W/O
0798221
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00821
PipeID
P17093
Time
4:33 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
I0286
Sewer Name
22 PUDDINGSTONE TRUNK, SECTS 1&2
City
SAN DIMAS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Capital Improvement Program Assesment
Project
20191207MDM_PUDDINGSTONE_TRUNK_SECTS_1_2
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0737
Downstream MH
22 0736
Dir. of Survey
Downstream
Length Surveyed
337.8 ft.
Total Length
337.8 ft.
Structural Index
4
Structural Quick
4D31
Structural Rating
101
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
105
Pipe schematic from manhole 22 0737 to 22 0736
MH: 22 0737MH: 22 0736downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:50AM0 ft. MGO - General Observation - MH CONN OPEN 3:000 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 OPEN2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING, PEELING CONCRETE2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SPORATIC2 ft. MGO - General Observation - 70% MAG COAT, FROM 9 TO 3 O'CLOCK, START58.1 ft. MGO - General Observation - PROJECTING SEVERE AGGREGATE85 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES - SPALLING PEELING CONCRETE SEVERE AGGREGATE DETACHED86 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"169.1 ft. MGO - General Observation - SPALLING PEELING CONCRETE SEVERE AGGREGATE DETACHED210.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4" - OPEN211 ft. MGO - General Observation - 70% MAG COAT, FROM 9 TO 3 O'CLOCK, FINISH211 ft. MGO - General Observation - 70% MAG COAT, FROM 9 TO 3 O'CLOCK, FINISH211 ft. MWM - Water Mark, 40 %of cross sectional area220.9 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MISSING SEVERE AGGREGATE314.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4" - CONN FACTORY STUB337 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish337 ft. MGO - General Observation - 40% MAG COAT, FROM 9 TO 3 O'CLOCK, FINISH337 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish337 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish337.8 ft. AMH - Downstream Manhole, Survey Ends - 4:30 AM

Observations (23)

DistanceCodeObservation
211MGO70% MAG COAT, FROM 9 TO 3 O'CLOCK, FINISH
337SAM
337MGO40% MAG COAT, FROM 9 TO 3 O'CLOCK, FINISH
58.1MGOPROJECTING SEVERE AGGREGATE
211MGO70% MAG COAT, FROM 9 TO 3 O'CLOCK, FINISH
210.9TFOPEN
169.1MGOSPALLING PEELING CONCRETE SEVERE AGGREGATE DETACHED
2SSSBLISTERING, PEELING CONCRETE
0AMH3:50AM
211MWM
0MGOMH CONN OPEN 3:00
0MWM
337.8AMH4:30 AM
314.5TFCCONN FACTORY STUB
86TFC
0MWL
0MGOMH CONN 9:00 OPEN
337SSS
337SAP
220.9SAMMISSING SEVERE AGGREGATE
2SAPSPORATIC
85SAMSPALLING PEELING CONCRETE SEVERE AGGREGATE DETACHED
2MGO70% MAG COAT, FROM 9 TO 3 O'CLOCK, START

Properties (7)

additional_info
WINCAN SHUTDOWN. OBSERVATIONS HANDWRITTEN, ENTERED LATER ON IN THE DAY.
custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED SPORATIC
custom_field_two
2
customer
LACSD
datetime
2019-12-09T04:33:03-08:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false