Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2019, 08:51 AM
  • Section#5_22 0742_22 0741__1292019__I0286.mp4

Date
12/09/2019
W/O
0798221
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00821
PipeID
P17098
Time
12:51 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
I0286
Sewer Name
22 PUDDINGSTONE TRUNK, SECTS 1&2
City
SAN DIMAS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Capital Improvement Program Assesment
Project
20191207MDM_PUDDINGSTONE_TRUNK_SECTS_1_2
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0742
Downstream MH
22 0741
Dir. of Survey
Downstream
Length Surveyed
277.7 ft.
Total Length
277.7 ft.
Structural Index
3
Structural Quick
4J2J
Structural Rating
330
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
330
Pipe schematic from manhole 22 0742 to 22 0741
MH: 22 0742MH: 22 0741downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:55AM2 ft. MGO - General Observation - MAG COAT 80% START2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGGREGATE MISSING2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED26 ft. MGO - General Observation - PEELING cONCRETE SEVERE AGGREGATE ATTACHED38 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"42 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"51 ft. MGO - General Observation - PEELING CONCRETE SEVERE AGG ATTACHED76.1 ft. MGO - General Observation - PEELING CONCRETE SEVERE AGG ATTACHED88.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - OPEN92 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4" - OPEN142.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"146 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"187.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"192.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"242.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"246 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"250.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN277.1 ft. MGO - General Observation - IN MH ACTIVE CONNECTION AT 3 O'CLOCK277.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED277.1 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGGREGATE MISSING277.7 ft. AMH - Downstream Manhole, Survey Ends - 1:30 AM

Observations (24)

DistanceCodeObservation
2MGOMAG COAT 80% START
146TFC
250.1TFOPEN
142.1TFC
0MWM
92TFOPEN
277.1MGOIN MH ACTIVE CONNECTION AT 3 O'CLOCK
51MGOPEELING CONCRETE SEVERE AGG ATTACHED
246TFC
76.1MGOPEELING CONCRETE SEVERE AGG ATTACHED
88.1TFOPEN
277.1SSSPEELING CONCRETE SEVERE AGG ATTACHED
38TFC
2SAMSEVERE AGGREGATE MISSING
192.1TFC
42TFC
26MGOPEELING cONCRETE SEVERE AGGREGATE ATTACHED
0MWL
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
0AMH12:55AM
187.1TFC
242.1TFC
277.1SAMSEVERE AGGREGATE MISSING
277.7AMH1:30 AM

Properties (7)

additional_info
WINCAN SHUTDOWN. OBSERVATIONS HANDWRITTEN, ENTERED LATER ON IN THE DAY.
custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
1
customer
LACSD
datetime
2019-12-09T00:51:41-08:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false