Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2020, 08:20 AM
  • 22 0257_22 0256 _01292020_002904.mp4

Date
01/29/2020
W/O
808206
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16539
Time
12:20 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7289
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_808206_TV22016_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0257
Downstream MH
22 0256
Dir. of Survey
Downstream
Length Surveyed
231.7 ft.
Total Length
231.7 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
2
O&M Quick
2H00
O&M Rating
90
Overall Index
2
Overall Quick
Overall Rating
315
Pipe schematic from manhole 22 0257 to 22 0256
MH: 22 0257MH: 22 0256downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02570 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start49.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"52.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"103.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"112.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"152.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"185.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"204 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"228.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish228.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish228.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish231.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK231.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE231.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0256

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    231.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (19)

DistanceCodeObservation
152.1TFC
0MWL
231.7MGOCONNECTION AT MH 9 O'CLOCK
112.8TF
0AMH22 0257
228.9SSS
228.9DAGS
103.9TFC
2DAGS
49.5TF
52.7TFC
0MWM
2SSS
204TFC
231.7MGOCOCKROACHES IN MANHOLE
231.7AMH22 0256
2SAP
185.4TF
228.9SAP

Properties (6)

additional_info
SC398775
custom_field_two
2
customer
LACSD
datetime
2020-01-29T00:20:04-08:00
documentation
PRO PIPE
is_lateral_inspection