Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2020, 08:47 AM
  • 22 0254_22 0253_01292020_005959.mp4

Date
01/29/2020
W/O
808206
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16536
Time
12:47 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7289
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_808206_TV22016_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0254
Downstream MH
22 0253
Dir. of Survey
Downstream
Length Surveyed
275.4 ft.
Total Length
275.4 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
270
O&M Index
2
O&M Quick
2J00
O&M Rating
108
Overall Index
2
Overall Quick
Overall Rating
378
Pipe schematic from manhole 22 0254 to 22 0253
MH: 22 0254MH: 22 0253downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02540 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"7.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"42.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"78.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"81.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"153.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"208.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"273.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish273.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish273.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish275.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0253275.4 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK

Observation photos (3)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
156.6TFC
0AMH22 0254
81.1TFC
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK
273.3SSS
0MWL
2SAP
2DAGS
273.3SAP
7.7TFC
42.2TFC
275.4AMH22 0253
275.4MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
78.1TF
0MGOCOCKROACHES IN MANHOLE
205.3TF
2SSS
153.9TF
208.6TFC
273.3DAGS
4.9TF

Properties (6)

additional_info
SC398775
custom_field_two
2
customer
LACSD
datetime
2020-01-29T00:47:20-08:00
documentation
PRO PIPE
is_lateral_inspection
false