Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 31, 2020, 07:10 AM
  • 22 0272_22 0271_01302020_232414.mp4

Date
01/30/2020
W/O
808206
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16557
Time
11:10 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7294
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_808206_TV22016_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0271
Downstream MH
22 0272
Dir. of Survey
Upstream
Length Surveyed
259.9 ft.
Total Length
259.9 ft.
Structural Index
3
Structural Quick
5C3I
Structural Rating
350
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
354
Pipe schematic from manhole 22 0271 to 22 0272
MH: 22 0271MH: 22 0272upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02722.6 ft. SRV - Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: YES, Finish2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish26.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"50.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"74.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.1 ft. SRV - Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: YES, Start99 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"179.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"203.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"227.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"257.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start257.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start257.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start259.9 ft. MWL - Water Level, 20 %of cross sectional area259.9 ft. AMH - Downstream Manhole, Survey Begins - 22 0271259.9 ft. MWL - Water Level, 25 %of cross sectional area

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: YES, Start

    162.8 ft. - Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
136.3TFA
257.3SRV
2DAGS
2SAP
257.3DAGS
56.4TFA
185.5TFA
257.3SSS
162.8SRV
259.9AMH22 0272
257.3SAP
0MWL
209TFC
160.9TFA
0AMH22 0271
32.7TFC
233.8TFC
0MWL
80TFC
2SSS

Properties (6)

additional_info
SC398780
custom_field_two
2
customer
LACSD
datetime
2020-01-30T23:10:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false