Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2020, 07:19 AM
  • 22 0268_22 0267A_01282020_232541.mp4

Date
01/28/2020
W/O
808206
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16552
Time
11:19 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7289
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_808206_TV22016_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0268
Downstream MH
22 0267A
Dir. of Survey
Downstream
Length Surveyed
128.5 ft.
Total Length
128.5 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
125
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
175
Pipe schematic from manhole 22 0268 to 22 0267A
MH: 22 0268MH: 22 0267Adownstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 02680 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"45.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"125.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish125.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish125.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish128.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK128.5 ft. AMH - Downstream Manhole, Survey Ends - 22 0267A

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
128.5MGOCONNECTION AT MH 9 O'CLOCK
45.9TFC
2DAGS
70.8TFC
2SSS
0MGOCONNECTION AT MH 3 O'CLOCK
0AMH22 0268
125.6SAP
95.8TFC
21.6TFC
119.1TFC
0MWL
0MWM
125.6DAGS
125.6SSS
2SAP
128.5AMH22 0267A

Properties (6)

additional_info
SC398775
custom_field_two
2
customer
LACSD
datetime
2020-01-28T23:19:08-08:00
documentation
PRO PIPE
is_lateral_inspection
false