Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2020, 09:49 AM
  • 22 0337_22 0263 _01292020_015955.mp4

Date
01/29/2020
W/O
808206
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16546
Time
1:49 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7289
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_808206_TV22016_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0263
Downstream MH
22 0337
Dir. of Survey
Upstream
Length Surveyed
210.1 ft.
Total Length
210.1 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
205
O&M Index
2
O&M Quick
2G00
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
287
Pipe schematic from manhole 22 0263 to 22 0337
MH: 22 0263MH: 22 0337upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 03370 ft. MGO - General Observation - CONNECTION AT MH 8 O'CLOCK1.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish23.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"60.1 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"72.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"109.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"121.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"193.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"208.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start208.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start208.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start210.1 ft. MWM - Water Mark, 35 %of cross sectional area210.1 ft. MWL - Water Level, 10 %of cross sectional area210.1 ft. AMH - Downstream Manhole, Survey Begins - 22 0263

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
40.7TFC
0MWM
208.6SSS
2SSS
0MWL
150TFA
16.5TFA
88.7TFC
2DAGS
210.1AMH22 0337
208.6DAGS
2SAP
0AMH22 0263
137.4TFC
210.1MGOCONNECTION AT MH 8 O'CLOCK
101TFC
208.6SAP
186.4TFC

Properties (6)

additional_info
SC398775
custom_field_two
2
customer
LACSD
datetime
2020-01-29T01:49:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false