Wastewater/Activity/PacpInspection/1.0Jan 29, 2020, 07:59 AM
  • 22 0259_22 0258 _01292020_000624.mp4

Date
01/28/2020
W/O
808206
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16541
Time
11:59 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7289
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_808206_TV22016_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0259
Downstream MH
22 0258
Dir. of Survey
Downstream
Length Surveyed
150 ft.
Total Length
150 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
145
O&M Index
2
O&M Quick
2E00
O&M Rating
58
Overall Index
2
Overall Quick
Overall Rating
203
Pipe schematic from manhole 22 0259 to 22 0258
MH: 22 0259MH: 22 0258downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 02592 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"67 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"121.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"147.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish147.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish147.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish150 ft. AMH - Downstream Manhole, Survey Ends - 22 0258150 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
24.7TFC
2SSS
147.9SSS
67TF
150AMH22 0258
121.9TF
124.6TFC
0MWL
2DAGS
147.9SAP
2SAP
0MWM
150MGOCONNECTION AT MH 9 O'CLOCK
70.2TFC
0MGOCONNECTION AT MH 3 O'CLOCK
147.9DAGS
0AMH22 0259

Properties (6)

additional_info
SC398775
custom_field_two
2
customer
LACSD
datetime
2020-01-28T23:59:41-08:00
documentation
PRO PIPE
is_lateral_inspection
false