Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2020, 09:30 AM
  • J 0057_J 0056_2112020_020112.mp4

Date
02/11/2020
W/O
0808067
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00062
PipeID
P11634
Time
1:30 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1353
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Capital Improvement Program Assesment
Project
20100211MDM_JOINT_OUTFALL_J_UNIT_2C
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
J 0057
Downstream MH
J 0056
Dir. of Survey
Downstream
Length Surveyed
704.8 ft.
Total Length
704.8 ft.
Structural Index
4
Structural Quick
5244
Structural Rating
28
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
28
Pipe schematic from manhole J 0057 to J 0056
MH: J 0057MH: J 0056downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MAG COAT 95% START0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:55AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE10.3 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG30 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG37.2 ft. MGO - General Observation - MAG COAT 70% START194.6 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG256.5 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR POSSIBLE377.8 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG437.2 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR POSSIBLE704.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE704.6 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG704.6 ft. MGO - General Observation - MAG COAT 70% FINISH704.8 ft. AMH - Downstream Manhole, Survey Ends - 2:45AM

Observation photos (8)

  • General Observation - MAG COAT 95% START

    0 ft. - General Observation - MAG COAT 95% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    10.3 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    30 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    194.6 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR POSSIBLE

    256.5 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR POSSIBLE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    377.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR POSSIBLE

    437.2 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR POSSIBLE

Observations (16)

DistanceCodeObservation
10.3SAMSEVERE AGG
0MWL
0MGOMAG COAT 95% START
2SSSBLISTERING PEELING CONCRETE
194.6SAMSEVERE AGG
37.2MGOMAG COAT 70% START
30SAMSEVERE AGG
704.8AMH2:45AM
437.2SRVLONG REBAR POSSIBLE
704.6SSSBLISTERING PEELING CONCRETE
377.8SAMSEVERE AGG
704.6SAMSEVERE AGG
0MWM
256.5SRVLONG REBAR POSSIBLE
704.6MGOMAG COAT 70% FINISH
0AMH1:55AM

Properties (6)

custom_field_three
SEVERE AGG MISSING-POSSIBLE LONG REBAR-70% MAG
custom_field_two
3
customer
LACSD
datetime
2020-02-11T01:30:05-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false