Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2020, 10:28 AM
  • 15 0361_15 0360_252020_024710.mp4

Date
02/05/2020
W/O
0812851
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00598
PipeID
P12287
Time
2:28 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1348
Sewer Name
15 BALDWIN PARK TRUNK
City
BALWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
18
Purpose
Capital Improvement Program Assesment
Project
20200105MDM_BALWIN_PARK_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
15 0361
Downstream MH
15 0360
Dir. of Survey
Downstream
Length Surveyed
80.8 ft.
Total Length
80.8 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 15 0361 to 15 0360
MH: 15 0361MH: 15 0360downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:55AM2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MAG COAT 30% START21.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING FLAKING CONCRTE24.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped28.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped77.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped80.4 ft. MGO - General Observation - MAG COAT 30% FINISH80.4 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG80.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING FLAKING CONCRETE80.8 ft. AMH - Downstream Manhole, Survey Ends - 3:10AM

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 30% START

    2 ft. - General Observation - MAG COAT 30% START

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING  FLAKING CONCRTE

    21.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING FLAKING CONCRTE

Observations (14)

DistanceCodeObservation
80.4MGOMAG COAT 30% FINISH
0MWL
80.4SAVSEVERE AGG
2SSSBLISTERING FLAKING CONCRETE
77.1TFCCapped
80.8AMH3:10AM
28.7TFCCapped
24.3TFCCapped
2SAVSEVERE AGG
0MWM
0AMH2:55AM
2MGOMAG COAT 30% START
80.4SSSBLISTERING FLAKING CONCRETE
21.4SSSBLISTERING FLAKING CONCRTE

Properties (6)

custom_field_three
SEVERE AGG VISIBLE
custom_field_two
3
customer
LACSD
datetime
2020-02-05T02:28:21-08:00
documentation
MARTIN,OLIVER 111,CASTILLO
is_lateral_inspection
false