A 0755_A 0754_2102020_015323.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
10 ft. - General Photograph - CIRCUM REBAR CORRODED & MISSING
10 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM & MISSING
12.5 ft. - Survey Abandoned - DOWNLEG UPSTREM SIPHON
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 1:55AM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWM | — |
| 12 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWL | — |
| 2 | SAM | SEVERE AGG |
| 12 | SAM | CIRCUM REBAR & MISSING |
| 12.5 | MSA | DOWNLEG UPSTREM SIPHON |
| 10 | MGP | CIRCUM REBAR CORRODED & MISSING |
| 10 | SRC | CIRCUM & MISSING |