Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 3, 2019, 07:12 AM
  • 02 0182_02 0181 _12032019_000327.mp4

Date
12/02/2019
W/O
798204
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00251
PipeID
P04538
Time
11:12 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7138
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
DOWNEY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_798204_TV02383_NOV2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
02 0182
Downstream MH
02 0181
Dir. of Survey
Downstream
Length Surveyed
376.1 ft.
Total Length
376.1 ft.
Structural Index
2
Structural Quick
3N2R
Structural Rating
418
O&M Index
2
O&M Quick
412]
O&M Rating
304
Overall Index
2
Overall Quick
Overall Rating
722
Pipe schematic from manhole 02 0182 to 02 0181
MH: 02 0182MH: 02 0181downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 01820 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MINERAL2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start42.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"45.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"74.6 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES98 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"101.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"141.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"144.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"194 ft. MWL - Water Level, 20 %of cross sectional area194.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"244.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"247.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN247.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"270 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start297.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"352.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"356.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"374 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish375 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish375.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish375.7 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish375.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish376.1 ft. AMH - Downstream Manhole, Survey Ends - 02 0181

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start - MINERAL

    2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MINERAL

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    74.6 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

Observations (31)

DistanceCodeObservation
247.3TBOPEN
0MWL
244.2TFC
374SSS
45.3TFC
297.1TFC
2DAGS
2DAZMINERAL
247.3TFC
197.6TFC
141.4TFC
375.7DAGS
194.4TFC
42.6TFC
376.1AMH02 0181
300.3TFC
0AMH02 0182
144.6TFC
0MWM
194MWL
375.7DAZ
356.1TF
352.9TFC
101.1TFC
2SSS
74.6CM
2CM
375.7CM
270MWLS
375MWLS
98TFC

Properties (6)

additional_info
SC378870
custom_field_two
3
customer
LACSD
datetime
2019-12-02T23:12:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false