Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 4, 2020, 05:38 AM
  • 02 0431_02 0430 _02032020_220050.mp4

Date
02/03/2020
W/O
808198
Weather
Very Dry
Operator/Surveyor
S LOPEZ
Sewer ID
Z00312
PipeID
P02754
Time
9:38 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7299
Sewer Name
02 70TH WAY EXTENSION TRUNK
City
PARAMOUNT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_808198_TV02338_JAN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 0431
Downstream MH
02 0430
Dir. of Survey
Downstream
Length Surveyed
305 ft.
Total Length
305 ft.
Structural Index
3
Structural Quick
413L
Structural Rating
316
O&M Index
2
O&M Quick
2K00
O&M Rating
120
Overall Index
2
Overall Quick
Overall Rating
436
Pipe schematic from manhole 02 0431 to 02 0430
MH: 02 0431MH: 02 0430downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. AMH - Upstream Manhole, Survey Begins - 02 04312 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"25 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Start32.2 ft. FM - Fracture Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES32.5 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Finish57.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"64 ft. FS - Fracture Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES, Start69 ft. FS - Fracture Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES, Finish111.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"158.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"205.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"258.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6"302.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish302.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish303 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish305 ft. AMH - Downstream Manhole, Survey Ends - 02 0430

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
205.8TFC
69FS
302.1CM
0MWM
25FL
303SSS
305AMH02 0430
258.6TFC
0MWL
111.1TFC
57.1TFC
2SSS
32.2FM
9.2TFC
64FS
0DAGS
32.5FL
158.6TFA
302.1DAGS
0AMH02 0431
2CM

Properties (6)

additional_info
SC398784
custom_field_two
2
customer
LACSD
datetime
2020-02-03T21:38:03-08:00
documentation
PRO PIPE
is_lateral_inspection
false