Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2016, 10:59 AM
  • 05 2326_05 0811 _12022016_025949.mp4

Date
12/02/2016
W/O
602600
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00419
PipeID
P06043
Time
2:59 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4026
Sewer Name
05 ARLINGTON AVENUE EXTENSION TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Routine Assessment
Project
WO_602600_TV05009_NOV2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 2326
Downstream MH
05 0811
Dir. of Survey
Downstream
Length Surveyed
129 ft.
Total Length
129 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
53
Pipe schematic from manhole 05 2326 to 05 0811
MH: 05 2326MH: 05 0811downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 23260 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start25.3 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES34 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"36.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"84.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"86.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"127.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish129 ft. AMH - Downstream Manhole, Survey Ends - 05 0811

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    25.3 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

Observations (11)

DistanceCodeObservation
36.8TFC
129AMH05 0811
0AMH05 2326
25.3CM
127.3DAGS
34TFA
2DAGS
0MWM
0MWL
86.9TF
84.2TFA

Properties (6)

additional_info
SC306418
custom_field_two
4
customer
LACSD
datetime
2016-12-02T02:59:29-08:00
documentation
PRO PIPE
is_lateral_inspection
false