Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2016, 10:06 AM
  • B 0568A_B 0568 _11162016_021700.mp4

Date
11/16/2016
W/O
602270
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00101
PipeID
P09117
Time
2:06 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3880
Sewer Name
B JOINT OUTFALL B - UNIT 7
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
26
Purpose
Routine Assessment
Project
WO_602270_TV15120_NOV2016
Sewer Type
Gravity
Material
CIP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
B 0568A
Downstream MH
B 0568
Dir. of Survey
Downstream
Length Surveyed
91.2 ft.
Total Length
91.2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2112
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole B 0568A to B 0568
MH: B 0568AMH: B 0568downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 O CLOCK ACTIVE0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - AT MH0 ft. AMH - Upstream Manhole, Survey Begins - B 0568A2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2.4 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start89.1 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish89.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish91.1 ft. MGO - General Observation - LATERAL AT MH 3 O CLOCK ACTIVE91.2 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - AT MH91.2 ft. MGO - General Observation - LATERAL AT MH 9 O CLOCK ACTIVE91.2 ft. AMH - Downstream Manhole, Survey Ends - B 0568

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
91.2VCAT MH
0MWM
91.1MGOLATERAL AT MH 3 O CLOCK ACTIVE
0MGOLATERAL AT MH 9 O CLOCK ACTIVE
0MWL
91.2MGOLATERAL AT MH 9 O CLOCK ACTIVE
2.4DAGS
91.2AMHB 0568
89.1SCP
0VCAT MH
0AMHB 0568A
2.4SCP
89.1DAGS

Properties (6)

additional_info
SC305212
custom_field_two
3
customer
LACSD
datetime
2016-11-16T02:06:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false