Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2016, 10:37 AM
  • B 0567_B 0566 _11162016_030028.mp4

Date
11/16/2016
W/O
6022701
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00101
PipeID
P09115
Time
2:37 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3880
Sewer Name
B JOINT OUTFALL B - UNIT 7
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
26
Purpose
Routine Assessment
Project
WO_602270_TV15120_NOV2016
Sewer Type
Gravity
Material
CIP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
B 0567
Downstream MH
B 0566
Dir. of Survey
Downstream
Length Surveyed
124.4 ft.
Total Length
124.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
4122
O&M Rating
9
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole B 0567 to B 0566
MH: B 0567MH: B 0566downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 O CLOCK MADE0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 05670 ft. MGO - General Observation - LATERAL AT MH 9 O CLOCK ACTIVE0 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - AT MH2.1 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start86.1 ft. OBZ - Obstacles Other, 10 %of cross sectional area, from 05 to 07 o'clock, Start - DEBRIS UNDER WATER124.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish124.4 ft. OBZ - Obstacles Other, 25 %of cross sectional area, from 04 to 08 o'clock - DEBRIS124.4 ft. OBZ - Obstacles Other, 10 %of cross sectional area, from 05 to 07 o'clock, Finish - DEBRIS124.4 ft. SCP - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish124.4 ft. AMH - Downstream Manhole, Survey Ends - B 0566

Observation photos (2)

  • Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Corrosion Metal Pipe, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWL
2.1SCP
2.4DAGS
0MGOLATERAL AT MH 9 O CLOCK MADE
0MWM
124.4DAGS
124.4OBZDEBRIS
0AMHB 0567
124.4OBZDEBRIS
86.1OBZDEBRIS UNDER WATER
124.4SCP
0MGOLATERAL AT MH 9 O CLOCK ACTIVE
0VCAT MH
124.4AMHB 0566

Properties (6)

additional_info
SC305212
custom_field_two
3
customer
LACSD
datetime
2016-11-16T02:37:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false