Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 9, 2018, 06:55 AM
  • 22 0282_22 0281 _08012018_225623.mp4

Date
01/08/2018
W/O
679260
Weather
Light Rain
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16568
Time
10:55 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5407
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_679260_TV22014_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0282
Downstream MH
22 0281
Dir. of Survey
Downstream
Length Surveyed
392.5 ft.
Total Length
392.6 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
390
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
390
Pipe schematic from manhole 22 0282 to 22 0281
MH: 22 0282MH: 22 0281downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 02820 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area3.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6"39.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"104.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"250.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"274.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"319.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"331.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"385.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"392.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish392.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0281392.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
319.3TFC
324.3TF
392.6SSS
392.6AMH22 0281
274.9TF
238.3TF
250.2TFC
3.2SAP
0MGOCONNECTION AT MH 9 O'CLOCK
385.6TF
392.6SAP
39.8TF
35.6TFA
331.8TF
0AMH22 0282
180.7TFA
3.2SSS
104.7TF
0MWM
0MWL

Properties (6)

additional_info
SC346781
custom_field_two
2
customer
LACSD
datetime
2018-01-08T22:55:52-08:00
documentation
PROPIPE
is_lateral_inspection
false