Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 9, 2018, 09:34 AM
  • 22 0277_22 0276 _09012018_013450.mp4

Date
01/09/2018
W/O
679260
Weather
Light Rain
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16563
Time
1:34 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5407
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_679260_TV22014_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0277
Downstream MH
22 0276
Dir. of Survey
Downstream
Length Surveyed
304.4 ft.
Total Length
304.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0277 to 22 0276
MH: 22 0277MH: 22 0276downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02770 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"117.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"161.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"230.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"304.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish304.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish304.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK304.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0276

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
5SAP
117.6TF
47.6TFC
161.9TF
0AMH22 0277
304.4SSS
5SSS
304.4SAP
0MGOCONNECTION AT MH 3 O'CLOCK
304.4MGOCONNECTION AT MH 3 O'CLOCK
0MWM
0MWL
304.4AMH22 0276
230.6TFC

Properties (6)

additional_info
SC346781
custom_field_two
2
customer
LACSD
datetime
2018-01-09T01:34:12-08:00
documentation
PROPIPE
is_lateral_inspection
false