Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 9, 2018, 09:03 AM
  • 22 0280_22 0279 _09012018_010331.mp4

Date
01/09/2018
W/O
679260
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16566
Time
1:03 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5407
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_679260_TV22014_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0280
Downstream MH
22 0279
Dir. of Survey
Downstream
Length Surveyed
238.8 ft.
Total Length
238.8 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
235
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
235
Pipe schematic from manhole 22 0280 to 22 0279
MH: 22 0280MH: 22 0279downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 02800 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"68.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"92.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"195 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish238.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish238.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0279

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MWL
0MGOCONNECTION AT MH 6 O'CLOCK
238.8SAP
0AMH22 0280
2.1SSS
92.9TFC
32.1TFC
0MGOCONNECTION AT MH 3 O'CLOCK
2.1SAP
238.8SSS
122.7TFC
195TFC
238.8AMH22 0279
0MWM
68.8TFC

Properties (6)

additional_info
SC346781
custom_field_two
2
customer
LACSD
datetime
2018-01-09T01:03:02-08:00
documentation
PROPIPE
is_lateral_inspection
false