Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 25, 2017, 05:15 AM
  • A 0416_A 0415 _24102017_212946.mpg

Date
10/24/2017
W/O
668747
Weather
Dry
Operator/Surveyor
E RUIZ
Sewer ID
Z00322
PipeID
P08076
Time
10:15 PM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5112
Sewer Name
A JOA-1A LONG BEACH WRP SLUDGE GRAVITY SEWER
City
LONG BEACH
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
11
Purpose
Routine Assessment
Project
WO_668747_TV19010_NOV2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
A 0416
Downstream MH
A 0415
Dir. of Survey
Downstream
Length Surveyed
113.3 ft.
Total Length
113.3 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole A 0416 to A 0415
MH: A 0416MH: A 0415downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 0416, DEBRIS INSIDE THE MH.0 ft. MWL - Water Level, 30 %of cross sectional area0.1 ft. MWM - Water Mark, 40 %of cross sectional area4.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start109.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish113.2 ft. MGO - General Observation - CAPPED CONNECTION AT 3 O' CLOCK AT MH113.2 ft. MGO - General Observation - CAPPED CONNECTION AT 9 O' CLOCK AT113.3 ft. AMH - Downstream Manhole, Survey Ends - A 0415

Observation photos (1)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
113.3AMHA 0415
0AMHA 0416, DEBRIS INSIDE THE MH.
4.4SSS
0.1MWM
0MWL
109.7SSS
113.2MGOCAPPED CONNECTION AT 3 O' CLOCK AT MH
113.2MGOCAPPED CONNECTION AT 9 O' CLOCK AT

Properties (6)

additional_info
SC348320
custom_field_two
2
customer
LACSD
datetime
2017-10-24T22:15:00-07:00
documentation
PROPIPE
is_lateral_inspection
false