Wastewater/Activity/PacpInspection/1.0May 2, 2017, 04:01 PM
  • 05 1124_05 1123_522017_092315.mp4

Date
05/02/2017
W/O
0630075
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00489
PipeID
P06360
Time
9:01 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7394
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 2
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Routine Assessment
Project
20170501DF_MONETA_EXTENSION_TRUNK_SECTION_2
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
05 1124
Downstream MH
05 1123
Dir. of Survey
Downstream
Length Surveyed
256.8 ft.
Total Length
256.8 ft.
Structural Index
3
Structural Quick
5144
Structural Rating
36
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
36
Pipe schematic from manhole 05 1124 to 05 1123
MH: 05 1124MH: 05 1123downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:04 AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.9 ft. SZ - Surface Other, from 12 to 12 o'clock, within 8 inches of joint: YES - CHIPPING8.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES43.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open51.5 ft. B - Broken, from 04 to 05 o'clock, within 8 inches of joint: YES51.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES94.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open105.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES113.6 ft. MGP - General Photograph - CRACK142.1 ft. MGO - General Observation - SPALLING143.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open147.8 ft. B - Broken, from 07 to 08 o'clock, within 8 inches of joint: YES188.9 ft. B - Broken, from 09 to 10 o'clock, within 8 inches of joint: YES189.3 ft. CS - Crack Spiral, from 05 to 06 o'clock, within 8 inches of joint: YES192.2 ft. B - Broken, from 12 to 02 o'clock, within 8 inches of joint: YES193.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open242.9 ft. B - Broken, from 01 to 03 o'clock, within 8 inches of joint: YES254 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish254 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256 ft. MGO - General Observation - ROACHES @ MH256.8 ft. AMH - Downstream Manhole, Survey Ends - 9:59 AM256.8 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active

Observation photos (14)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 12 to 12 o'clock, within 8 inches of joint: YES - CHIPPING

    8.9 ft. - Surface Other, from 12 to 12 o'clock, within 8 inches of joint: YES - CHIPPING

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    30 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Broken, from 04 to 05 o'clock, within 8 inches of joint: YES

    51.5 ft. - Broken, from 04 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    51.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    105.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph - CRACK

    113.6 ft. - General Photograph - CRACK

  • General Observation - SPALLING

    142.1 ft. - General Observation - SPALLING

  • Broken, from 07 to 08 o'clock, within 8 inches of joint: YES

    147.8 ft. - Broken, from 07 to 08 o'clock, within 8 inches of joint: YES

  • Broken, from 09 to 10 o'clock, within 8 inches of joint: YES

    188.9 ft. - Broken, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 05 to 06 o'clock, within 8 inches of joint: YES

    189.3 ft. - Crack Spiral, from 05 to 06 o'clock, within 8 inches of joint: YES

  • Broken, from 12 to 02 o'clock, within 8 inches of joint: YES

    192.2 ft. - Broken, from 12 to 02 o'clock, within 8 inches of joint: YES

  • Broken, from 01 to 03 o'clock, within 8 inches of joint: YES

    242.9 ft. - Broken, from 01 to 03 o'clock, within 8 inches of joint: YES

Observations (27)

DistanceCodeObservation
30CL
142.1MGOSPALLING
147.8B
0MGOConn. @ Mh, 9 O' Clock. Active
0MWL
193.7TFOpen
51.5B
94.3TFOpen
256.8AMH9:59 AM
143.6TFOpen
254CM
256MGOROACHES @ MH
256.8MGOConn. @ Mh, 9 O' Clock. Active
254SSS
0AMH9:04 AM
8.9SZCHIPPING
192.2B
8.9CM
242.9B
113.6MGPCRACK
2SSS
188.9B
189.3CS
105.6CM
0MWM
43.3TFOpen
51.5CM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-05-02T09:01:31-07:00
documentation
FRANKLIN, IGNACIO, OBREGON
is_lateral_inspection
false