05 1126_05 1125_512017_091222.mp4
4 ft. - Fracture Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES
8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
17.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
69.2 ft. - Broken, from 07 to 09 o'clock, within 8 inches of joint: YES
123.6 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"
339.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
341.8 ft. - Upstream Manhole, Survey Ends - 09:45 AM
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 09:15 AM |
| 8 | SSS | — |
| 273.3 | CM | — |
| 341.8 | AMH | 09:45 AM |
| 330.8 | TBA | — |
| 0 | MGO | CONNECTION AT MH, 3 OCLOCK, ACTIVE |
| 123.6 | TBA | — |
| 4 | FM | — |
| 336.1 | TBA | — |
| 275.3 | TBA | — |
| 222.5 | TBA | — |
| 0 | MWM | — |
| 69 | TFA | — |
| 69.2 | B | — |
| 339.9 | SSS | — |
| 173.4 | TFA | — |
| 74.2 | TFA | — |
| 226.9 | TBA | — |
| 17.9 | CM | — |
| 281.6 | TB | — |
| 0 | MWL | — |
| 120.2 | TFA | — |
| 169.3 | TBA | — |
| 326.3 | CM | — |