Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 28, 2017, 03:43 PM
  • 05 1129_05 1128_4282017_101426.mp4

Date
04/28/2017
W/O
0630075
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00489
PipeID
P06365
Time
8:43 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7391
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 2
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Routine Assessment
Project
20170427MI_MONETA_EXTENSION_TRUNK_SECTION_2
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
05 1129
Downstream MH
05 1128
Dir. of Survey
Downstream
Length Surveyed
337.8 ft.
Total Length
337.8 ft.
Structural Index
3
Structural Quick
5141
Structural Rating
26
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
26
Pipe schematic from manhole 05 1129 to 05 1128
MH: 05 1129MH: 05 1128downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:13 AM0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area3.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES16.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"21.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Open37.8 ft. MGP - General Photograph - SURFACE SPALLING, 8 TO 4 OCLOCK67.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"72.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open100.4 ft. MGO - General Observation - HIGH WATER MARK CHANGE, 10 TO 2 OCLOCK123.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"126.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES128.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES173 ft. B - Broken, from 03 to 06 o'clock, within 8 inches of joint: YES174.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.9 ft. CM - Crack Multiple, from 12 to 06 o'clock, within 8 inches of joint: YES180 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open230.1 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open234 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Open236.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES304 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open308 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"323.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES334.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337.8 ft. MGO - General Observation - CONNECTION AT MH, 3 OCLOCK, ACTIVE337.8 ft. AMH - Downstream Manhole, Survey Ends - 10:45 AM337.8 ft. MGO - General Observation - CONNECTION AT MH, 9 OCLOCK, ACTIVE

Observation photos (8)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - SURFACE SPALLING, 8 TO 4 OCLOCK

    37.8 ft. - General Photograph - SURFACE SPALLING, 8 TO 4 OCLOCK

  • General Observation - HIGH WATER MARK CHANGE, 10 TO 2 OCLOCK

    100.4 ft. - General Observation - HIGH WATER MARK CHANGE, 10 TO 2 OCLOCK

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    131.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Broken, from 03 to 06 o'clock, within 8 inches of joint: YES

    173 ft. - Broken, from 03 to 06 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open

    230.1 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    323.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Downstream Manhole, Survey Ends - 10:45 AM

    337.8 ft. - Downstream Manhole, Survey Ends - 10:45 AM

Observations (29)

DistanceCodeObservation
308TBA
174.9TFA
304TBOpen
72.7TFOpen
337.8MGOCONNECTION AT MH, 3 OCLOCK, ACTIVE
337.8AMH10:45 AM
180TFOpen
334.7SSS
37.8MGPSURFACE SPALLING, 8 TO 4 OCLOCK
0AMH10:13 AM
100.4MGOHIGH WATER MARK CHANGE, 10 TO 2 OCLOCK
3.9SSS
234TBOpen
126.4CM
128.3TFA
173B
0MWM
131.4CM
177.9CM
323.1FM
236.6CM
16.6TFA
67.6TFA
123.2TFA
230.1TBOpen
0MWL
337.8MGOCONNECTION AT MH, 9 OCLOCK, ACTIVE
21.7TFOpen
6.2CM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-04-28T08:43:12-07:00
documentation
IGNACIO, FRANKLIN
is_lateral_inspection
false