Wastewater/Activity/PacpInspection/1.0Apr 28, 2017, 03:40 PM
  • 05 1131_05 1130_4282017_085534.mp4

Date
04/28/2017
W/O
0630075
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00489
PipeID
P06367
Time
8:40 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7391
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 2
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Routine Assessment
Project
20170427MI_MONETA_EXTENSION_TRUNK_SECTION_2
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
05 1131
Downstream MH
05 1130
Dir. of Survey
Downstream
Length Surveyed
334.7 ft.
Total Length
334.7 ft.
Structural Index
3
Structural Quick
4136
Structural Rating
30
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
32
Pipe schematic from manhole 05 1131 to 05 1130
MH: 05 1131MH: 05 1130downstream0 ft. MGO - General Observation - CONNECTION AT MH, 9 OCLOCK, ACTIVE0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 OCLOCK, ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 09:00 AM2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES80.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - Open86.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open93.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES144 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - Open149.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open183 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - Open186.5 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES188.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Open192.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES238.1 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES238.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"244.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Open286.3 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"289 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES291.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open295.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES322.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES325.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - Open328.5 ft. CM - Crack Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES330.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Open332.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish332.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES332.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.7 ft. AMH - Downstream Manhole, Survey Ends - 09:30 AM

Observation photos (8)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - Open

    80.1 ft. - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - Open

  • Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open

    86.2 ft. - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    186.5 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    192.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Downstream Manhole, Survey Ends - 09:30 AM

    334.7 ft. - Downstream Manhole, Survey Ends - 09:30 AM

Observations (32)

DistanceCodeObservation
80.1TFOpen
183TFOpen
2DAGS
332.8DAGS
328.5CM
0MGOCONNECTION AT MH, 9 OCLOCK, ACTIVE
149.3TFOpen
238.7TF
289CL
286.3TFA
192.1CM
244.2TFOpen
86.2TFOpen
186.5CL
188.2TFOpen
325.1TFOpen
334.7AMH09:30 AM
322.4CM
295.7CM
2SSS
332.8CM
0MWM
330.4TFOpen
291.8TFOpen
332.8SSS
238.1CL
0MWL
93.3CM
0MGOCONNECTION AT MH, 3 OCLOCK, ACTIVE
6FM
144TFOpen
0AMH09:00 AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-04-28T08:40:46-07:00
documentation
IGNACIO, FRANKLIN
is_lateral_inspection
false