Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2018, 10:52 AM
  • 05 0859_05 0858 _13082018_043503.mp4

Date
08/13/2018
W/O
718156
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00457
PipeID
P06089
Time
3:52 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5983
Sewer Name
05 IMPERIAL HIGHWAY EXTENSION TRUNK
City
HAWTHORNE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
09
Purpose
Routine Assessment
Project
WO_718156_TV05334_AUG2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 0858
Downstream MH
05 0859
Dir. of Survey
Upstream
Length Surveyed
61.1 ft.
Total Length
61.1 ft.
Structural Index
3
Structural Quick
4536
Structural Rating
42
O&M Index
4
O&M Quick
4231
O&M Rating
11
Overall Index
3
Overall Quick
Overall Rating
53
Pipe schematic from manhole 05 0858 to 05 0859
MH: 05 0858MH: 05 0859upstream0 ft. DSZ - Deposits Settled Other, 30 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES0 ft. MCU - Camera Underwater0 ft. MSA - Survey Abandoned - CAM UNDERWATER DUE TO DEBRIS0 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish8.8 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO27.7 ft. MGO - General Observation - CAM GOING UNDER WATER DUE TO OFF SET JOINTS32.5 ft. MMC - Material Change, Cast Iron32.5 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish34.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"50.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"52.1 ft. JOL - Joint Offset Large53.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"54.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"56.8 ft. JSL - Joint Separated Large59 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start61.1 ft. MWM - Water Mark, 15 %of cross sectional area61.1 ft. AMH - Downstream Manhole, Survey Begins - 05 085861.1 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (7)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Joint Separated Large

    4.3 ft. - Joint Separated Large

  • Joint Offset Large

    9 ft. - Joint Offset Large

  • Material Change, Cast Iron

    28.6 ft. - Material Change, Cast Iron

  • Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    28.6 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO

    52.3 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO

  • Deposits Settled Other,  30 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES

    61.1 ft. - Deposits Settled Other, 30 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
61.1DSZ
28.6MMC
7.4TB
52.3DSZ
28.6SCP
9JOL
28.6FM
6.6TF
61.1MCU
61.1MSACAM UNDERWATER DUE TO DEBRIS
61.1SCP
26.3TFC
4.3JSL
2.1FM
0MWM
0AMH05 0858
10.9TF
0MWL
33.4MGOCAM GOING UNDER WATER DUE TO OFF SET JOINTS

Properties (6)

additional_info
SC364747
custom_field_two
5
customer
LACSD
datetime
2018-08-13T03:52:11-07:00
documentation
PROPIPE
is_lateral_inspection